Project
Supervision of Irrigation Schemes Rehabilitation Works
MWASIP
Consultancy services for the Review of existing feasibility studies and preparation of detailed design and construction supervision of new Irrigation Systems, and WUA Establishment in the targeted Irrigation Schemes
Upilewetu Irrigation Scheme – 89 ha: 30 m long Weir Intake with design capacity 0.0765 m3/s, 590 m conveyance pipeline, 839 m main pipeline
Mango Irrigation Scheme – 115 ha: 8 meters long Weir Intake with design capacity 0.182 m3/s
Bilira Irrigation Scheme – 12 ha: 9 meters long Weir Intake with design capacity 0.014 m3/s, length of main pipeline including conveyance Pipe line 592m
Mpoya and Mdere Irrigation Scheme – 32 ha: Weir: the weir is 8 meters with design capacity 0.03221 m3/s, length of main pipeline A combined 4037m; 2100m for Mpoya and 1937m for Mdere
Chitseke Irrigation Scheme – 40 ha: Weir Intake 32 m wide and 1.9 m high
Fufule Irrigation Scheme – 39 ha: Two Weir Intakes, 17 m long and 1.7 m high, conveyance conduit comprises 3,746 m long canal
Thava Irrigation Scheme – 54 ha: Weir Intake 10 m wide, 1.5 m high, conveyance comprises 498 m long pipeline and 1,551 m long canal
Tsenjerani Irrigation Scheme – 12 ha: Weir Intake, 50 m long and 2.9 m high, conveyance conduit 350 m long pipeline, 1,296 m long canal